Derived from “PCA” and “CNA” reports.
Includes a spreadsheet that projects the time and quantity of repair along with replacement of the property's elements. These costs are calculated annually as reserves to be held in anticipation of need. The term is variable and can be any length of time desired (5, 10, 15 or more years).
VALUE ADDED:
Allows lender/ owner to schedule funds accordingly based on long-term repairs/ replacements.